Sale!

SUBDIVIDE 2 LOTS SUBDIVISION PLAN BASIC

Original price was: $2,200.00.Current price is: $1,990.00.

Description

SUBDIVIDE 2 LOTS BASIC PLAN
SUBDIVIDE 2 LOTS SUBDIVISION PLAN BASIC
SUBDIVIDE 2 LOTS BASIC PLAN SSH
SUBDIVIDE 2 LOTS SUBDIVISION PLAN BASIC

SUBDIVIDE 2 LOTS

SUBDIVISION PLAN BASIC SKU 122-020.

WHAT IS IN THE PACK ?

Subdivision Plan: A basic concept subdivision plan is needed when a large lot is subdivided into smaller lots.

Shows the new lot(s) to be created and their aerial view, shape of how they will look, easements, service trench location(s), access, SPOS POS, im/permeable surface areas, outline of house foot print.(optional extras: septic system plan, AHD levels and nearby houses and watercourses, solar sun track).

 

What is Needed by us: A copy of title and lot plan (or we get online same day fee applies) so we can read restrictions.

A list of guidelines from you (hand sketch) & any developers design guidelines are needed to draft a subdivision plan.

Those guidelines can include the area of each house, the width of the road(s) in the subdivision, the space between houses, etc.

Copy of title and any registered restrictive covenant. The title information must include a ‘register search statement’ and the title diagram, and any associated ‘instruments’.

We produce an electronic copy of a layout plan drawn to scale and fully dimensioned showing:

  • The location, shape and size of the site. The location of any existing buildings, car parking areas and private open space.
  • The location, shape and size of the proposed lots to be created.
  • The location of any easements on the subject land.
  • The location of any significant vegetation, waterways and wetlands.
  • The location of the approved stormwater discharge point (LPOD) and effluent disposal areas.
  • Any abutting roads.
  • Existing and proposed vehicle access to the lots.

Cost: Cost to draft a subdivision is from $1000+ /$3000+ / $10,000+ /$20,000+

plus costs & reports, subject to number of lots and details.

Turnaround time: 5 business days for 2 lots. Price for over 2 lots subdivision basic plan, to be quoted.

Quoted each project. Basic Concept 2 Lot Plan starts at $1000.

Other Services we provide

  • Land Survey.
  • Titling.
  • Soil Test.
  • Engineering.
  • Plans & Permits.
  • Civil Works.
  • Septic Systems.
  • Roads, dams, bores.

 

Example of second dwelling
Small Second Home 
4 lots all with frontages
Subdivide 4 Lot Concept Render
4 lots
Example of a simple 4 lot Sub Division Base Plan

 

MORE INFO or CALL 1300-911-138.

Subdividing your land and the development of two or more houses in one lot / multiple lots  can be a very profitable venture !

However, gaining approvals is a crucial part of property development in Victoria. And going in headfirst without proper guidance can cost you any profit – even a loss..

You can divide a large land into smaller lots and develop them separately. This is where a a plan of subdivision comes in. The Subdivision Act regulates how subdivisions are made, and there are a few important things to keep in mind for subdivisions in Victoria.

To ensure your project’s success, the experts are here to help you with a comprehensive subdivision plan guide.

How to gain professional insights for $220 !

Unsure about your next building project ? Get expert advice !

Take advantage of our $220 Consultation at SSH. We’re here to answer your queries and bring clarity to your vision. With our transparent process and reputable track record, your project is in capable hands.

What You Will Get From The Small Second Homes $220 IN OFFICE Consultation Session ($660 Value)

  1. Free professional insights and advice without upfront costs
  2. Understand your specific requirements, vision, and goals
  3. Explore all available options for your project
  4. Provide an overview of the design process and timelines
  5. Answer all your questions and concerns by experts
  6. Receive personalised recommendations for your project

So let’s begin!

What Is A Plan Of Subdivision?

A subdivision plan represents the way you divide the land into smaller pieces so you can own, sell, or rent them separately. Under a subdivision plan, each lot has an independent title and must be registered and approved for development and has rates payable (and may be subject to land tax ).

The process can create easements, restrictions, and owner corporations. It can also remove or change existing easements and restrictions with a planning permit or a planning scheme. (Refer Section 32 of the Subdivision Act 1988 Vic)
In Victoria, subdivisions are approved by the local council through the Planning Legislation. This ensures that land is used in a sustainable way and considers a variety of other factors, including neighborhood amenity, environmental, social, and economic concerns.

If your land is mortgaged, the lender will need to consent.

Why A Subdivision Plan Should Be Considered Early – ASAP

If you buy land without first getting formal approval, you can face many problems and liability – you buy it , you own the problems !

For example, if the lots are not on a registered plan, the water supply may not be usable, or the road may not be well-maintained. Developers who have bought land can face trouble selling it because the ownership or title is in question.

A timely subdivision approval process ensures that:

  • Your land & services are suitable for the new authorised use.
  • The proposal meets all of the requirements in the community’s official planning and zoning and provincial laws and policies.
  • Minimise the risk of getting your development plan rejected at a later stage.
  • Your community, as a whole, is safe from developments that are not appropriate or may put an undue strain on environmental resources.

Ticking off all the boxes with the right permits and consents maximises return on investment. So if you’re considering a subdivision of land, let’s set out a preliminary concept subdivision plan.

Plan Of Subdivision Short Checklist – The Requirements For Approval

The preliminary subdivision plan is the first step where you set out the procedure with surveys and certifications.

Along the process, you’re also are to meet several statutory requirements for the plan. This includes getting your engineering plan, and strata plan of subdivision approved.

Here’s the complete plan of subdivision checklist to put your process into perspective: 

1. Land Survey With A Licensed Professional

Subdivision is a complicated process that requires certain legal requirements to be followed. A licensed land surveyor must oversee the application process. The council also recommends surveying your land as the first step before applying for a permit.

A land surveyor will also be responsible for compiling relevant documents and data about your land to apply for a planning permit aligned with the Subdivisions Act. So ensure to bring an expert professional in Victoria on board.

2. Planning Permit Application

The surveyor or SSH will apply for a permit to develop the land in question with subdivision.

If the permit is approved, this will mean that the subdivision proposal meets the requirements of the Planning Commission. The permit will also set the general conditions under which the subdivision can be approved and registered completely.

This is also where the council will highlight any legal or construction requirements based on zoning and regulatory laws.

3. Local Council Certification

To get your plan approved, you must submit it to the council for certification. Certification ensures that the plan meets the Subdivision Act 1988, the planning permit requirements, and any referral authorities.

You will need to get approvals for any engineering plans (if required) and complete any work. Once you have obtained a certificate of planning, you will be advised of the conditions that need to be met to obtain final approval and registration.

4. Statement Of Compliance

The subdivision process requires that you get a statement of compliance from the council to finalise a plan of subdivision.

This final approval letter from the council confirms that all the requirements for the subdivision have been covered, and you can officially register each property with independent titles.

5. Land Title Registration

The certified subdivision plan will show where your new lot will be located, and the compliance statement will tell the government that you have followed all the rules.

Finally, the last step is to submit the plan and statement of compliance at Land Use Victoria. Once approved, the new titles will be assigned to each lot.

How Long Does It Take To Register A Plan Of Subdivision In Victoria?

The planning process can take a while, depending on the plan’s particulars.

For example, depending on the complexity, it can take at least 3/6/9 months he surveyor involved, and on average, it can take 12 – 18 months to register your plan with the land registry – titles office.

After your plan is registered, it can take up to 4 – 6 weeks for the bank to consent to the subdivision, and then it will take up to 6 weeks on average to create and register the titles.

CALL 1300-911-138.